    摘要:

    对于运营期间的铁路,在其路基外侧新建悬臂挡墙式高速铁路路基等新增荷载必然会对既有路基产生一定的位移变形,影响轨道的平顺性。本文以南昌昌景黄铁路邻近悬臂挡墙式路基段施工为背景,结合实际工况,基于HSS小应变刚度模型,采用有限元分析平台(Plaxis3D)分析了不同控制手段下新建悬臂挡墙式路堤对邻近既有线的扰动变形影响,并对各种措施的控制效率做出评估,提出了对于并线新建路堤需要重点关注的关键控制点。计算结果表明:高压旋喷桩和隔离桩手段能够有效控制新建线对既有线所带来的扰动,且采用“8m高压旋喷桩+4m隔离桩”方案控制变形效果最佳。研究成果既可直接应用于铁路标段工程,又可应用于今后的高速铁路新建工程,提供建设经验。

    Abstract:

    For the railway in operation period, the new cantilever retaining wall type high-speed railway subgrade outside its subgrade and other new loads will inevitably produce a certain displacement deformation on the existing subgrade and affect the smoothness of the track. In this paper, based on the construction of the cantilever retaining wall subgrade section of Nanchang Jinghuang railway, combined with the actual conditions, the finite element analysis platform (PLAXIS 3D) is used to establish a three-dimensional numerical analysis model, and the HSS model is used to analyze the influence of the new cantilever retaining wall embankment on the adjacent existing lines, and the causes of the disturbance are explained, and the actual construction standard value is used to control, High pressure jet grouting pile and isolation pile are used to solve the disturbance caused by the new line to the existing line, and the control efficiency of various measures is evaluated, and the key control points that need to be focused on for the new embankment of the parallel line are put forward. The calculation results show that the scheme of "8m high pressure jet grouting pile + 4m isolation pile" can effectively reduce the deformation of adjacent existing lines. The research results can not only be directly applied to the railway project, but also be applied to the new high-speed railway project in the future, providing construction experience.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2021-08-24
  • 最后修改日期:2021-09-18
  • 录用日期:2021-09-18
  • 在线发布日期:
  • 出版日期:
Baidu
map
关闭